CIS-SPM Practice Questions with Explanations

Certified Implementation Specialist - Strategic Portfolio Management

How an idea becomes a demand, a project, resource assignments, time cards and costs, mapped to the CIS-Strategic Portfolio Management blueprint, with worked scenarios and sourced 2026 exam logistics.

Maintained by the SNReady teamLast updated AI-drafted, human review in progress

See blueprint
Questions on the exam
See blueprint
Duration
Not published
Cut Score
$450
Exam Cost
100
Practice Questions
15
Free Questions

ServiceNow does not publish the cut score, and the official exam blueprint says it is not always 70%. Exams are registered and paid for in ServiceNow University, scheduled through Pearson VUE (source).

CIS-Strategic Portfolio Management is an exam about following one piece of work through its whole life: an idea someone submits, the demand it becomes, the project that delivers it, the people assigned to it, the hours they log and the money that results. Project Management is the biggest domain, but it is less than a third of the blueprint. Much of the blueprint is about the joins: where an idea turns into a demand, a demand into a project, a resource assignment into a time card, and a time card into a cost. This page explains those joins and the records behind them.

Blueprint

What the CIS-SPM exam tests

The CIS-Strategic Portfolio Management blueprint (KB0011561, updated January 2026) has nine domains:

CIS-SPM blueprint domain weightsProject Management30%Resource Management23%Idea and Demand18%SPM Financials10%Portfolio Planning Workspace8%Timecard Management5%SPM Implementation Overview2%SPM Platform Analytics & Dashboards2%SPM Better Together2%
Domain weights from the official CIS-SPM exam blueprint (KB0011561, updated January 2026).

1. SPM Implementation Overview (2%)

  • •SPM implementation preparation
  • •General configurations
  • •Now Create methodology

2. SPM Financials (10%)

  • •Properties and tables
  • •Financial planning
  • •Cost types
  • •Rate types
  • •Expense lines
  • •Rate model

3. Resource Management (23%)

  • •Personas, properties, and roles
  • •Resource Management Workspace
  • •Resource assignments
  • •Planning attributes
  • •Capacity planning
  • •Schedules

4. Idea and Demand (18%)

  • •Roles and tables
  • •Idea Portal
  • •States
  • •Innovation Management integration with Universal Request
  • •Idea and demand conversion
  • •Demand form
  • •Demand Workbench
  • •Defining stakeholders
  • •Assessments

5. Project Management (30%)

  • •Properties, roles, and tables
  • •Project Workspace
  • •States
  • •Subprojects
  • •Tasks
  • •Relationships (tasks and dependencies)
  • •Project templates
  • •Importing projects
  • •RIDAC
  • •Baselines
  • •Status reports
  • •Schedules
  • •Diagnostics

6. Timecard Management (5%)

  • •Plugins, roles, and tables
  • •Categories
  • •Policies
  • •Rate types

7. Portfolio Planning Workspace (8%)

  • •Plugins, roles, tables, and properties
  • •Portfolio Planning Workspace
  • •Lenses
  • •Planning items
  • •Display limits
  • •Integrating Portfolio Planning with PPM
  • •Scenario Planning

8. SPM Platform Analytics & Dashboards (2%)

  • •Platform Analytics
  • •Dashboards

9. SPM Better Together (2%)

  • •ServiceNow applications that integrate with SPM

Three domains carry 71% of the weight. Project Management (30%) covers properties, roles and tables, Project Workspace, states, subprojects, tasks and dependencies, templates, importing projects, RIDAC, baselines, status reports, schedules and diagnostics. Resource Management (23%) covers personas and roles, the Resource Management Workspace, resource assignments, planning attributes, capacity planning and schedules. Idea and Demand (18%) runs from the Idea Portal and idea states through the Universal Request integration and idea-to-demand conversion to the demand form, Demand Workbench, stakeholders and assessments.

SPM Financials (10%) lists cost types, rate types, expense lines and the rate model. Portfolio Planning Workspace (8%) covers lenses, planning items, display limits, integration with PPM and scenario planning. Timecard Management (5%) is categories, policies and rate types. The last three domains are 2% each: implementation overview (including the Now Create methodology), Platform Analytics and dashboards, and the other ServiceNow applications that integrate with SPM. All of this is from the blueprint.

The blueprint's suggested pre-requisites include Welcome to ServiceNow, ServiceNow Administration Fundamentals, Get Started with Now Create and ServiceNow Platform Implementation.

Mental model

How the SPM pieces fit together

How an idea becomes a demand and then a project, with portfolio planning above and resources, time and money below, mapped to the CIS-SPM domainsPortfolio Planning Workspacelenses, planning items, scenarios: which work fits the plan (8%)IdeaInnovation ManagementIdea and Demand (18%)Demandscreen, assess, approveProjecttasks, baselines, RIDACProject Management (30%)Deliveredstatus, closureResource Management (23%)resource assignments, planning attributes,capacity, Resource Management WorkspaceTime cards (5%) and Financials (10%)time worked, rate types, rate models,cost plans, expense lines
Flow from Innovation Management, the Demand Management life cycle and creating a project from a demand; domain weights from the CIS-SPM blueprint. A mental model, not an official diagram.

Ideas come first, and they are not demands. Innovation Management is a central repository where users submit, track, discuss and vote on ideas, for example through the Idea Portal (Innovation Management). An idea manager evaluates each idea, accepts or rejects it, or moves it to the backlog, and turns accepted ideas into a demand, project or story (Evaluate an idea). With the Universal Request integration, an agent can create an idea straight from a universal request, and idea states are mapped to universal request states (Innovation Management and Universal Request).

Demands are where the business case is decided. Demand states are Draft, Submitted, Screening, Approved and Completed (Demand Management). Demand managers add tasks, stakeholders, requirements, risks, decisions and resource assignments, and decision makers use assessment results to approve or reject; the Assessment Required field controls whether an assessment is triggered (process flow). The Demand Workbench shows demands in a bubble chart above a list, and changes in either pane update the other (Demand workbench).

Which artifact a demand can create depends on its fields. The Create Project related link appears only when the demand's Category is Strategic and its Type is Project; other combinations and installed applications lead to enhancements, changes, defects or agile work items (Create an artifact from a demand).

Projects: structure and control

Project Management can run on its own or as part of Project Portfolio Management (Project Management). Templates save a reusable structure of tasks, subtasks, attachments and checklists (templates). RIDAC records (risk, issue, decision, action, request change) can be converted into one another, so a risk can become several issues (RIDAC). Project Diagnostics runs scans for corrupt data such as invalid top tasks and invalid relations, which can come from bad field mapping during an import (diagnostics).

Resources: assignments over plans

Classic resource plans move through Planning, Requested, Confirmed (soft allocations) and Allocated (hard allocations) (resource plans). ServiceNow now says resource plans will no longer be available for new customers in future releases and points to resource assignments in the Resource Management Workspace or Project Workspace (resource management process). The workspace gives resource managers a central view of allocations, unassigned work and over-allocated resources (Resource Management Workspace). Planning attributes drive attribute-based resource mapping and the labor costs generated from it (planning attributes).

How an approved time card becomes a labor cost on a projectTime cardapproved for a project taskHourly raterate model, else labor rate cardExpense linelabor cost generatedCost planactuals against plan
Based on Manage costs (Time Card Management), Rate Models and Create a project cost plan. A mental model, not an official diagram.

Time is where resources turn into money. Time Card Management works with the Task table, so people record time against projects, incidents, problems and change requests. Time sheets are routed for approval by the Project time approver and Non-project time approver fields in the user's time sheet policy, and the project_manager and resource_manager roles contain timecard_approver in the base system (Time Card Management). When a time card for a project task is approved, an expense line is generated for the labor cost. The hourly rate comes from the project's rate model if it has one, otherwise from the labor rate card (Manage costs). A rate model is a set of date-effective rate lines evaluated criterion by criterion (Rate Models). Rate types such as Standard and Overtime categorize the kind of work (rate types).

Portfolio Planning sits above it all. Lenses are planning perspectives. Portfolio Planning provides three predefined lenses (Organization, Project Portfolio and Project Program), each with its own planning levels (Lenses). A scenario is a simulated version of a plan, so you can reprioritize and move dates without touching the live plan. Its In Plan toggle starts on for items that are Prioritized or Done and fall within the plan dates (Scenario planning). ServiceNow positions Portfolio Planning Workspace for waterfall demand and project planning and Strategic Planning Workspace for traditional, agile or hybrid work (Portfolio Planning).

Architect's shorthand

Ideas are collected. Demands are decided. Projects are delivered. Resource assignments say who, time cards say how long, and rate models turn that into what it cost. Portfolio Planning asks whether it fits the plan. Most scenario questions are about which of those records you should be looking at.

Worked scenarios

Industry scenarios

These are illustrative situations written by SNReady, not taken from the exam.

Financial services

A service desk agent hears the same improvement request every week

Branch staff keep contacting the employee service desk asking for a better loan-tracking screen. The agent has nowhere to put the request except a ticket that gets closed.

With Innovation Management integrated with Universal Request, the agent can create an idea from the universal request; the idea becomes the request's primary ticket and idea states drive the request's state (source). The idea manager then evaluates it and, if accepted, creates a demand from it (source). If the demand's Category is Strategic and its Type is Project, the Create Project link becomes available (source).

What the exam is checking: Following an item across the idea, demand and project records, and knowing what has to be true for each conversion.

Public sector

Contractor rates changed halfway through the quarter

An agency's project uses contractors whose hourly rates vary by role and changed on 1 July. Actual costs for July look wrong.

Approved time cards for project tasks generate labor expense lines, priced from the project's rate model if one is linked, otherwise from labor rate cards (source). A rate model holds date-effective rate lines per criteria combination; when a request spans two rate lines, it applies each rate to the hours in its own date range (source). The fix is a correct rate model linked to the project, not editing expense lines by hand.

What the exam is checking: Knowing where an hourly rate comes from, and the order of fallback when there is no rate model.

Manufacturing

The steering committee asks how far the plant upgrade has slipped

The project is behind schedule and over budget. The sponsor wants to see the original plan against reality and a record of the risks that turned into problems.

A schedule baseline captures planned dates for every task and milestone and appears as gray lines under the Gantt bars; a financial baseline snapshots the cost plan, benefit plan and financial metrics, but not actual costs. Only top-level projects can have baselines (source). Risks that materialised can be converted into issues, decisions or actions on the RIDAC page, keeping the link between them (source).

What the exam is checking: Telling schedule from financial baselines, and knowing what a baseline does not capture.

Healthcare

Next year's budget is cut and the portfolio has to be re-ranked

A hospital group's portfolio owner must show leadership which initiatives survive a smaller budget before anything changes in the live plan.

Scenario planning creates a simulated version of the plan. Items can be moved in or out of plan and dates adjusted without affecting the live plan; scenarios can be compared side by side, a target budget set per planning cycle, and the best one approved (source). Choosing the right lens, for example Project Portfolio versus Organization, decides the perspective the plan is built from (source).

What the exam is checking: Using a scenario rather than the live plan for what-if decisions.

Misconceptions

Common CIS-SPM misconceptions

Misconception

“CIS-SPM is a project management exam.”

What the sources say

Project Management is 30% of the blueprint. Resource Management, Idea and Demand, Financials, Portfolio Planning and time cards make up most of the rest (blueprint).

Misconception

“An idea and a demand are the same thing.”

What the sources say

Ideas live in Innovation Management and are evaluated by an idea manager; accepted ideas are turned into demands or other work (Evaluate an idea). Demands have their own states and assessment process (Demand Management).

Misconception

“Time cards are just a timesheet tool.”

What the sources say

An approved time card on a project task generates an expense line for the labor cost (Manage costs). Time cards are how actual labor cost reaches the project.

Misconception

“A baseline records actual cost.”

What the sources say

A financial baseline captures the cost plan, benefit plan and project-level metrics, not actual cost, and nested projects cannot have baselines (Create baseline of a project).

Logistics

CIS-SPM logistics and prerequisites

Booking and delivery

  • Exams are registered and paid for in ServiceNow University and scheduled through Pearson VUE, signing in with SSO. Exam vouchers no longer exist (ServiceNow Community, Jan 2026; see also this July 2026 thread).
  • Training: on-demand courses are free but don't include an exam attempt; instructor-led training is paid ($1,900 for 2 days, $2,700 for 3 days) and includes the first attempt (source). Sources differ on whether a course is mandatory: the January 2026 summary says completing the course unlocks eligibility, while a May 2026 reply describes the recommended courses as “not required but highly recommended” (CAD thread). Check the registration page for your exam.
  • Once registered, you must sit the exam within 90 days or the attempt is forfeited. Exam payments are non-refundable, but you can reschedule without a fee inside the rescheduling window (source).

CIS-SPM format, fees and scoring

  • We couldn't find a public ServiceNow source for the current question count and time limit, so we don't quote one. Check the official CIS-SPM blueprint after signing in to Now Learning.
  • Exam fee: $450 USD excluding tax (ServiceNow University). Retake fee: $225 USD (source).
  • ServiceNow doesn't publish the cut score: each exam is scored against a predetermined cut score that is not shared with candidates, and it is the same for everyone (ServiceNow Community, Jul 2026). Treat any “70% to pass” claim as a guess.
Minimum waiting periods between exam attemptsAttempt 1Attempt 2wait 3 daysAttempt 3wait 30 daysAttempt 4+wait 6 months each
Waiting periods between attempts, per the 2026 rules summarised on the ServiceNow Community.

Our blueprint source data doesn't list a mandatory prerequisite certification for CIS-SPM, unlike the CIS exams that now require CIS-Data Foundations first. It lists the courses above as recommended. Confirm the current requirements on the exam registration page before you book. The ServiceNow certification paths page shows where CIS-SPM sits among the other tracks.

Practice

Practise the joins, not the menus

Start with the free sample questions further down this page, then work through CIS-SPM practice questions by topic and the CIS-SPM study guide. For each question, name the record you start on and the record you end on: idea or demand, resource assignment or time card, cost plan or expense line.

Sources

Every exam fact and product behaviour on this page links to one of these ServiceNow sources. Check them before you book: exam rules change between releases.

  1. CIS-SPM exam blueprint, KB0011561 (updated January 2026)
  2. Welcome to ServiceNow (Now Learning course page)
  3. ServiceNow Administration Fundamentals (Now Learning course page)
  4. ServiceNow Platform Implementation (Now Learning course page)
  5. Get Started with Now Create (Now Learning course page)
  6. Exploring Innovation Management
  7. Evaluate an idea
  8. Integrating Innovation Management with Universal Request
  9. Exploring Demand Management
  10. Demand Management process flow
  11. Demand workbench
  12. Create an artifact from a demand
  13. Exploring Project Management
  14. Create baseline of a project
  15. Adding RIDAC records for a project
  16. Project Diagnostics
  17. Applying templates to projects
  18. Create a project cost plan
  19. Using the Planning attributes
  20. Exploring Resource Management Workspace
  21. Resource management process
  22. Resource plans
  23. Rate Models
  24. Time Card Management
  25. Manage costs (Time Card Management)
  26. Create a rate type
  27. Exploring Portfolio Planning
  28. Lenses in Portfolio Planning
  29. Scenario planning in Portfolio Planning
  30. “Cost of Mainline certification exams”, ServiceNow University KB0013317
  31. Mark Roethof, “2026 exam vouchers, courses, exams & retakes – major changes explained”, ServiceNow Community, 18 Jan 2026
  32. “Exam vouchers eligibility”, ServiceNow Community, 6–8 Jul 2026
  33. “CAD Voucher”, ServiceNow Community Developer forum, 3 May 2026
  34. “CSA Exam” (cut score question), ServiceNow Community SysAdmin forum, 16 Jul 2026

Practice by blueprint domain

Our CIS-SPM questions follow the official exam blueprint, one set per domain, with each domain's share of the exam. Read the CIS-SPM blueprint, explained.

CIS-SPM practice questions

100 questions from 9 topics, 15 free

Newest question added: AI-assisted drafts, not yet individually reviewedHow questions are made

1
application

An admin is starting a Strategic Portfolio Management rollout and wants a single workspace that brings together the setup items for Financials, Project and Demand Management, and Portfolio Planning. Which should the admin use?

AProject Workspace
BPortfolio Planning Workspace
CServiceNow Otto for Setup (SPM)
DResource Management Workspace

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: C. ServiceNow Otto for Setup (SPM)

ServiceNow Otto for Setup (SPM) centralizes administration of the Strategic Portfolio Management applications in one workspace. Its console brings together setup items for common configuration, Financials, Project and Demand Management, Strategic Planning and Portfolio Planning, and Enterprise-Wide Deployment, so it is the place to drive an SPM rollout.

  • Why A is wrong: Project Workspace is used to plan and manage projects from an interactive central workspace, not to configure the SPM applications.
  • Why B is wrong: Portfolio Planning Workspace is used to enhance traditional product and portfolio management; it is not the administration console for SPM setup.
  • Why D is wrong: Resource Management Workspace is used to view the allocation and breakdown of work assigned to resources, not to set up the SPM applications.
2
application

During an SPM implementation, the PMO configuration lead needs to view and modify the preferences, configurations, and settings for projects, demands, programs, portfolios, resources, and time cards. Which role should the admin grant?

Ait_portfolio_manager
Bit_project_manager
Cit_demand_manager
Dit_pps_admin

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: D. it_pps_admin

The PPS admin [it_pps_admin] role, installed with PPM Standard, can view and modify the preferences, configurations, and settings for projects, demands, programs, portfolios, resources, time cards, and agile development. The project manager role description itself points to it_pps_admin for configuration access.

  • Why A is wrong: The portfolio manager role gives access to all portfolios with the permissions of a project user and a demand user; it is not described as a configuration role.
  • Why B is wrong: The project manager role is used to create and manage projects, tasks, and resource plans; the documentation directs you to it_pps_admin for configuration access.
  • Why C is wrong: The demand manager role gives access to the Demand Management modules only, not settings across projects, programs, resources, and time cards.
3
application

Before an approval meeting, a demand manager wants decision makers to visually compare all qualified demands plotted by risk, value, and size. Which tool should the demand manager use?

ADemand roadmap
BDemand workbench
CStakeholder registry
DDemand tasks

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: B. Demand workbench

The demand workbench provides a single point of engagement for assessing and approving demands. Its bubble chart plots demands by risk, value, and size and displays all qualified demands, updating as demands are created and assessed.

  • Why A is wrong: The demand roadmap shows all demands currently in an active state on a timeline-style view; it does not plot qualified demands by risk, value, and size.
  • Why C is wrong: The stakeholder registry is used to automatically populate stakeholder lists on new demands and projects, not to compare demands.
  • Why D is wrong: Demand tasks are units of work used to break down initial planning activities within a demand, not a visual comparison tool.
4
application

A demand manager wants to create a defect directly from an approved demand, but no related link for that artifact is available. Which application must be installed?

AProject Portfolio Suite
BAgile Development 2.0
CContinual Improvement Management
DStrategic Planning

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: A. Project Portfolio Suite

The artifacts you can create from a demand depend on the demand's category and type and on the applications installed. The documentation lists Project Portfolio Suite as the application required to create an enhancement, change, or defect from a demand.

  • Why B is wrong: Agile Development 2.0 is required to create stories or epics from a demand.
  • Why C is wrong: Continual Improvement Management is required to create improvement initiatives from a demand, not defects.
  • Why D is wrong: Strategic Planning is required to create Enterprise Agile Planning entities (epic, feature, or capability) from a demand.
5
application

On a project, the testing task must not start until the development task has started. Which dependency type should the project manager create between the development task (predecessor) and the testing task (successor)?

AFinish-to-start
BFinish-to-finish
CStart-to-start
DStart-to-finish

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: C. Start-to-start

A start-to-start dependency indicates that a successor task must not be started until the predecessor task has started. Testing can therefore begin once development is underway, without waiting for development to finish.

  • Why A is wrong: Finish-to-start would hold testing until development finishes, which is stricter than the requirement.
  • Why B is wrong: Finish-to-finish links the finish dates of the two tasks, not the start of the successor.
  • Why D is wrong: Start-to-finish constrains when the successor can finish, not when it can start.
6
application

Several project tasks have slipped. The project manager wants the Gantt chart to show a line for each task's original planned start and end dates so the severity of the delays is visible. What should have been created?

AA milestone
BA rollup task
CLag time
DA baseline

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: D. A baseline

A baseline is a snapshot of the planned start and end dates of each task at the time it is created. A line appears under each task on the Gantt chart for those original dates, so when tasks slip the baseline indicator shows how severe the delays are.

  • Why A is wrong: A milestone is a zero-duration task used to indicate an important date, not a snapshot of original task dates.
  • Why B is wrong: A rollup task is a parent task that aggregates child task values such as effort; it does not show original planned dates.
  • Why C is wrong: Lag time is a manually specified gap between a predecessor and successor task; it does not record original dates.
7
application

A resource manager reviews a submitted resource plan for an upcoming demand and blocks the requested resources, creating soft allocations but not yet hard allocations. Which state is the resource plan in now?

AConfirmed
BAllocated
CPlanning
DRequested

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: A. Confirmed

After a plan is requested, the resource manager can block or confirm the resources for future projects and demands, which moves the plan to the Confirmed state. Soft allocations are created at this point; they become hard allocations only when the plan moves to Allocated.

  • Why B is wrong: In the Allocated state soft allocations are converted to hard allocations, which has not happened yet here.
  • Why C is wrong: Planning is the default state when the requester creates the plan, before it is submitted.
  • Why D is wrong: Requested is the state after the requester submits the plan for review, before the resource manager confirms resources.
8
application

A new engineer has joined a delivery group, but a project manager cannot find the engineer when building a resource plan. Which role must the engineer have to be considered for resource planning?

Aresource_user
Btimecard_user
Cpps_resource
Dresource_manager

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: C. pps_resource

Only users with the PPS resource [pps_resource] role are considered for resource planning, and only users or groups with that role appear in resource plans. Granting pps_resource to the engineer makes them available to resource plans.

  • Why A is wrong: resource_user is the requester role used to create resource plans and request resources; it does not make a person a plannable resource.
  • Why B is wrong: timecard_user lets a user create time cards for themselves; it does not control resource plan eligibility.
  • Why D is wrong: resource_manager is used to review resource plans and confirm and allocate resources, not to be planned as a resource.
9
understanding

A time card approver approved a team member's time card, and an expense line has since been generated for the associated task. Which state is the time card in?

ASubmitted
BApproved
CRecalled
DProcessed

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: D. Processed

A time card in the Processed state is an approved time card with an expense line for the associated task. Approved alone describes an approved time card without that expense line.

  • Why A is wrong: Submitted is the state of a time card waiting for approval, before it is approved.
  • Why B is wrong: Approved describes an approved time card; once an expense line exists for the task, the state is Processed.
  • Why C is wrong: Recalled is used when an approved time card is pulled back for adjustments, which is not described here.
10
application

A field services company needs time worked to be categorized as standard hours versus overtime so that a downstream third-party product knows the nature of the work. What should the time card admin configure?

AThe Auto Generate Time Cards job
BProject time categories
CRate types
DTime sheet policies

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: C. Rate types

Rate types are used to categorize different types of work, for example Standard versus Overtime. They can also tell a downstream, third-party product about the nature of the work performed. A time card admin creates them under Time Sheets > Administration > Rate Types.

  • Why A is wrong: The Auto Generate Time Cards scheduled job creates time cards for project tasks automatically; it does not categorize work as overtime.
  • Why B is wrong: Project time categories are subcategories that define specific project activities, not standard versus overtime work.
  • Why D is wrong: Time sheet policies define the rules a time sheet or time card must follow, including approval workflow, not work rate categories.
11
application

A project manager in Project Workspace has resource assignments on a project and wants the planned labor costs for the project generated or refreshed in one step. Which option should the project manager use?

AFinancial baseline
BGenerate labor costs
CNew expense line
DNew cost plan

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: B. Generate labor costs

Generate labor costs is a one-click option on the Project Workspace financials screen that generates or refreshes the planned labor costs for the planning item based on its resource assignments. It is enabled only for projects with resource assignments.

  • Why A is wrong: A financial baseline captures costs so they can be compared later with the initial forecast; it does not generate labor costs.
  • Why C is wrong: The New expense line side panel is used to record unplanned expenses, not to derive planned labor costs.
  • Why D is wrong: New cost plan opens a side panel to create a cost plan manually; it does not calculate labor costs from resource assignments.
12
application

A demand manager wants to record the estimated financial benefit a demand is expected to deliver in each fiscal period, so it can be weighed against the demand's costs. What should the demand manager create on the demand?

AMonetary benefit plan
BDemand budget
CDemand cost plan
DNon-monetary benefit plan

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: A. Monetary benefit plan

Demand benefit plans capture the potential benefits accrued by a demand when it is executed. A monetary benefit plan specifies the estimated benefit in a category for a fiscal period, and its breakdown records hold estimated and actual benefits per fiscal period.

  • Why B is wrong: A demand budget sets the funding available to the demand by fiscal year; it does not record expected benefits.
  • Why C is wrong: A demand cost plan captures the costs of the demand, not its expected benefits.
  • Why D is wrong: A non-monetary benefit plan captures non-financial benefits, while the scenario calls for a financial benefit.
13
application

A strategy lead wants a standalone visual roadmap in Portfolio Planning Workspace to start high-level planning of work from different units of the company, without being limited to items prioritized in a portfolio plan. What should the strategy lead create?

AA roadmap in tracking mode
BA free-form roadmap
CA Hierarchy tab view
DA portfolio plan roadmap

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: B. A free-form roadmap

Portfolio Planning Workspace offers two roadmap types: portfolio plan roadmaps and free-form roadmaps. A free-form roadmap is a standalone visual roadmap for starting high-level planning of work from different units of the company, while a portfolio plan roadmap shows only items prioritized on the Prioritization page.

  • Why A is wrong: Tracking mode is a read-only view that shows progress of existing roadmap items; it does not create a new roadmap.
  • Why C is wrong: The Hierarchy tab is a backlog view of the work pipeline, like the Prioritization tab; it is not a standalone roadmap.
  • Why D is wrong: A portfolio plan roadmap shows only the planning items prioritized on the Prioritization page, which the strategy lead wants to avoid.
14
application

A project manager wants a report of the users who did not submit their time cards, and of time cards not yet approved, for the projects the project manager manages. Which dashboard provides this?

AAnalytics User manager
BPortfolio Planning Execution dashboard
CAnalytics Project manager
DPMO dashboard

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: C. Analytics Project manager

The Analytics Project manager dashboard (formerly Project Manager Dashboard) gives project managers reports of time card exceptions for their projects. Its Project time card exceptions report lists users who did not submit time cards and time cards not yet approved for the selected project and time range.

  • Why A is wrong: Analytics User manager reports time sheet exceptions for users whose Manager field is the current user, not by project.
  • Why B is wrong: The Execution dashboard in Portfolio Planning gives visibility into delivery progress across work items, not time card exceptions.
  • Why D is wrong: The PMO dashboard gives portfolio and program managers an overview of investments, intake pipeline, and upcoming dates.
15
application

Business teams manage their day-to-day work on Boards. The portfolio manager wants those Boards to appear as planning items on the Prioritization and Roadmap pages of a portfolio plan. Which integration provides this?

AHardware Asset Management integration
BCollaborative Work Management integration
CDigital Product Release workspace integration
DAI Control Tower workspace integration

👆 Click an option above to select your answer

Show answer and explanation

Correct answer: B. Collaborative Work Management integration

Integrating Collaborative Work Management (CWM) with Portfolio Planning lets you plan and roadmap with Boards in a portfolio plan. After CWM Boards are added to a lens configuration, they appear as planning items on the Prioritization and Roadmap pages of the portfolio plan.

  • Why A is wrong: The Hardware Asset Management integration tracks which HAM requests or refreshes belong to an SPM project in Project Workspace.
  • Why C is wrong: The Digital Product Release integration shows planning items associated with product enhancements in the Release scope page of the Digital Product Release workspace.
  • Why D is wrong: The AI Control Tower integration tracks strategic priorities, goals, and planning and execution items categorized as Artificial Intelligence.

Get Full CIS-SPM Access

Unlock all 100 practice questions with detailed explanations

CIS-SPM Only — Lifetime

$9
  • All CIS-SPM questions
  • Timed mock exams
  • Personalized study plan generator
  • Detailed explanations
  • Lifetime access — never expires
BEST VALUE

Lifetime Access

$49
  • ALL certifications included
  • All practice questions
  • Timed mock exams
  • Personalized study plan generator
  • Detailed explanations
  • Lifetime access — never expires
  • Future updates included

15 free questions available to try first • One-time payment, no subscription

CIS-SPM exam FAQ

Is there a free CIS-SPM practice test?

15 of our 100 CIS-SPM practice questions are free on this page, with explanations. The full set and timed mock exams cost $9 one-time.

Is there a CIS-SPM mock exam?

Yes. The CIS-SPM mock exam is timed and draws from the full question bank, with an explanation for every answer when you finish. It is included with full access.

Are these real CIS-SPM exam questions?

No. SNReady questions are original practice questions, drafted with AI assistance against ServiceNow's documentation and the CIS-SPM exam blueprint. They are not copied from the exam, and human review of them is still in progress. See how the questions are made.

What does the CIS-SPM exam cover?

The official blueprint (KB0011561, updated January 2026) has 9 domains. The heaviest is Project Management at 30% of the exam. Every domain and objective is on the CIS-SPM blueprint, explained.

What is the CIS-SPM passing score?

ServiceNow does not publish the cut score, and the official exam blueprint says it is not always 70%.